DETAILS OF WORK UNDER WATER SUPPLY SECTOR

GWL/WS/01 : Supply and installation of bulk meters (strategic locations 19 Nos.) and (bulk consumers 6 Nos.).

GWL/WS/02  : Rehabilitation of WTPs (2 Nos.) & CWPS (2Nos.).

GWL/WS/03 : Leak Detection and repairs (>250mm dia pipelines ) & 5000 connections pilot area.

  • Leak detection and Repairs in Pilot Area (5000 connections) and all water lines (AC/CI/PVC/GI/MS)

  • Leak detection and Repairs for Transmission & Distribution system (all lines above 250 mm dia; AC/CI/MS)

  • Training of GMC & PIU staff in leakage detection and repairs activities

GWL/WS/04 : Distribution System: Lashkar (East & West) 80 mm(37.5 km), 100 mm(45 km), 150 mm(22.5 km), 200mm(22.5 km), 250mm(15 km) and 300mm(7.5 km) (PE 100/ DI).

GWL/WS/06 : Distribution System: Gwalior and Morar 80 mm(20 km), 100 mm(24 km), 150 mm(12 km), 200mm(12 km), 250mm(8 km) and 300mm(4 km) (PE 100/ DI).

GWL/WS/05 :Phase II : Consumer Meter: Non-domestic & domestic above 1/2".

GWL/WS/07 : Rehabilitation of 600 mm dia CI Transmission Main from old WTP at Motijheel to Amkho OH Reservoir.

GWL/WS/08 : Over Head Service Reservoir, Lashkar East & West (5 nos., capacity 12 ML;Lot 1) Gwalior and Morar (3 nos., capacity 8 ML;Lot 2).

GWL/WS/10 : Consumer Meters

  • 1,20,000 numbers ranging from ½” to 2”

  • Domestic consumers 1,00,000

  • Non-domestic and Industrial 20,000

GWL/WS/11 : New Water Supply Scheme from Tighra Dam 45 MLD.

It includes:

Raw Water Pumping Station

45 MLD New Water Treatment Plant

Clear Water Reservoir & Pumping Station

Treatment Plant mainly comprise of:

  • Aerator

  • Flash Mixers

  • Tube Settlers

  • Rapid Gravity Filters

 

GWL/WS/12 : Rising main and feeder mains (4.2 km  Raw Water Pumping Main, 800mm dia DI-K9 pipes and 9.5 km Clear Water Pumping Main, 750mm dia).

  • Raw Water Pumping Main

          4200 m, 800 mm dia DI K9 pipes

  • Clear Water Pumping Main

           9500 m, 750 mm dia DI K9 pipes


DETAILS OF WORK UNDER WASTE WATER AND SANITATION SECTOR

PMU/WW/01 : Procurement of Sewer Suction cum Jetting, Suction and Jetting machine of various capacities.

GWL/WW/01 : Augmentation sewerage system: Lashkar zone (350-1200 mm dia, RCC) 15km.

GWL/WW/02 : Installation of new sewerage system: Lashkar and Gwalior Zone (150 to 300mm dia, SWSG) 190 km.

GWL/WW/03 : Installation of new sewerage system: Gwalior zone (350 to 1000 mm dia RCC) 15km.

GWL/WW/04 : 90 MLD capacity Sewage Treatment Plant (Waste Stabilization Ponds).

Treatment Plant mainly comprise of:

  • Medium Screen Chamber

  • Grit Chamber

  • Parshall Flume

  • Anaerobic Pond

  • Facultative Ponds

  • Effluent Channel

 

 

GWL/WW/05 : Sewage Pumping Station & Pumping Main.

GWL/WW/06 : Rehabilitation of existing Public Toilets (54 Nos.) and construction of new Public Toilets (49 Nos.).


DETAILS OF WORK UNDER DRAINAGE SECTOR

GWR/DR/01 : Construction of New Secondary Drains (length 50 kms).

GWR/DR/02 : Construction of New Secondary Drains (length 50 kms).

GWR/DR/03 (LCB IR) : Renovating existing primary and secondary drains (length 10 kms).

 

  

Terms and Conditions | Privacy Policy | Disclaimer

| Feedback    | Contact Us
Site Designed and Maintained by
Project Uday
Urban Water Supply & Environmental Improvement in Madhya Pradesh)
Urban Administration & Development Department
Government of Madhya Pradesh
“Beej Bhawan”, Arera Hills, Bhopal -462011